
Trenches, pads and bedding for underground propane lines from the tank to the house, coordinated with your propane supplier.
Many rural and suburban homes rely on propane. The tank sits on a pad some distance from the house, and a buried line carries the gas to the meter or regulator at the wall. That line needs a straight trench, a clean bed and a route that avoids driveways and other utilities.
We prepare the pad for the tank, dig the route to the house and keep the trench open for the propane supplier or a qualified gas fitter to install and test the line. After inspection, we backfill and restore the lawn. Pipe installation, tank setting and connection stay with the supplier or the qualified contractor.
Tanks must sit at set distances from buildings, property lines and openings. Your supplier gives the layout, and we prepare the pad and route to match.
A tank on soft ground can settle and strain its connections. We compact the base and build a level pad of the size the supplier specifies.
The buried line is easy to forget until it is struck. Warning tape and a route record protect the investment and the next digger.
Tank distances from buildings, property lines and openings are set by code and the supplier. Planning the location carefully before trenching saves moving anything later.
Drag the handle to compare.

BeforeAfterCompacted base built to size.
Clear of drives and other lines.
Trench ready for the gas fitter.
Line easy to find later.
Rock-free bed for the pipe.
Lawn restored after inspection.
Every topic has its own page with what to expect and how we approach it.
SituationRural and AcreageLong runs for water, power, propane and septic on farms and country lots, through rock, creeks and fields.Learn more
SituationHomeowner Line RepairsSlow drains, wet spots, low pressure and sunken lawns: how to tell what is wrong underground and what…Learn more
Material guideTracer Wire and TapeThe inexpensive extras that make a buried line findable and safe from the next shovel: warning tape, tracer…Learn more Enter trench length, width and depth and see cubic yards of soil, truckloads and bedding stone to plan for.
Tell us what you need and send photos or a site plan if you can. We plan the visit so we arrive ready.
We call 811, walk the site, confirm lines and plan the route and depth.
You get a clear written price, and we agree a day and an arrival window.
Trenching or boring to the plan, with safe walls, careful spoil handling and protection for your lawn.
Pipe or conduit laid on a good bed, joints checked, tests and inspections done before cover-up.
Compacted backfill, grading, sod or paving repair and a walk-through with you.
The supplier sets the tank. We prepare the pad and trench so the supplier can install quickly.
A qualified gas fitter or the supplier pressure tests the line. We keep the trench open until they finish.
Yes. We trench to the generator pad as well, with the supplier and installer.
Distance affects pipe size and cost, and rules set minimums. Your supplier advises, and we dig the route.
Required distances depend on tank size and local rules. Your supplier gives the exact layout.
Natural Gas Line TrenchingTrenching, bedding and backfill for underground natural gas lines, coordinated with the gas utility and the qualified crews…Explore
Generator and EV TrenchingTrenches, conduit and pads for standby generators, EV chargers, hot tubs and outbuildings, so your electrician can finish…Explore
New Home HookupsWater, sewer, electric, gas and communication connections for a new house, trenched and stubbed to the foundation on…Explore
Utility TrenchingStraight, clean trenches for water, sewer, electric, gas and communication lines, cut to depth and width by machines…Explore Tell us about the job and we will call you back quickly.
Or call (615) 357-7797 to talk now.