
Precast vaults, large meters, backflow assemblies and isolation valves set below ground for commercial and multi-unit properties.
Larger properties do not use a simple meter box. They use vaults: concrete structures that hold large meters, backflow preventers and valves below grade where they are protected from traffic and weather. Setting one correctly takes heavy equipment and careful measuring.
We excavate for the vault, build a compacted stone base, set the precast structure at the right elevation and connect the piping inside. Hatches and lids are set to final grade so they do not become trip hazards or collect water, and piping is supported so the weight does not pull on the vault walls.
Precast vaults are heavy and unforgiving. A firm, level stone base and careful setting prevent cracked joints and rocking lids over the life of the structure.
Large valves and meters are heavy. Pipe supports, restrained joints and wall seals keep stress off the vault and keep water out.
Vaults are confined spaces. We place ladders, hatches and drains with later service crews in mind, so they can work safely.
Vaults are confined spaces, and anyone entering needs the right training and equipment. We design access and ventilation so later crews can work safely, and we do not enter vaults without proper procedures.
Drag the handle to compare.

BeforeAfterVaults for meters and backflow assemblies.
No rocking, no cracked joints.
Piping supported and restrained.
Hatches rated for the location.
Sump or daylight drain where allowed.
Lids flush with the surface.
Every topic has its own page with what to expect and how we approach it.
SituationCommercial and IndustrialUtilities for stores, offices and industrial sites: fire lines, vaults, sewer, storm, power and conduit, built to the…Learn more
SituationDevelopers and BuildersInfrastructure for subdivisions and multi-lot projects: schedules, sequencing, inspections and clean hand-offs to the next trades.Learn more
Material guideDuctile Iron PipeThe strong, long-lived metal pipe used for water mains, fire lines and heavy-duty crossings, and how it is…Learn more Enter trench length, width and depth and see cubic yards of soil, truckloads and bedding stone to plan for.
Tell us what you need and send photos or a site plan if you can. We plan the visit so we arrive ready.
We call 811, walk the site, confirm lines and plan the route and depth.
You get a clear written price, and we agree a day and an arrival window.
Trenching or boring to the plan, with safe walls, careful spoil handling and protection for your lawn.
Pipe or conduit laid on a good bed, joints checked, tests and inspections done before cover-up.
Compacted backfill, grading, sod or paving repair and a walk-through with you.
We can supply or install vaults provided by the project. Precast structures are ordered to the engineer drawings and lead times vary.
Many do. Where allowed, we plan a drain or sump so water does not stay in the vault.
Backflow assemblies often need a qualified tester or installer. We build the vault and piping and coordinate with that provider.
Yes. It involves a shutdown and a tie-in, and we schedule it with the utility to limit downtime.
No. Confined space rules apply. Only trained crews with proper equipment should enter.
Taps and MetersTap preparation, meter boxes and meter settings built to the utility standard so your new service connects without…Explore
Hydrants and Fire LinesHydrants, fire service lines and the underground pipe that feeds sprinkler systems, installed to the standards fire officials…Explore
Commercial Site UtilitiesUnderground water, sewer, storm, fire and electrical systems for stores, offices, warehouses and industrial buildings.Explore
Manholes and StructuresPrecast manholes, junction boxes, inlets and vaults set at the right elevation, sealed and ready for traffic and…Explore Tell us about the job and we will call you back quickly.
Or call (615) 357-7797 to talk now.