
Enter trench length, width and depth and see cubic yards of soil, truckloads and bedding stone to plan for.
These tools give planning-level estimates from typical values. They are not quotes, designs or engineering, and results depend on your actual soil, depth, access, local rules and conditions. Only a visit can confirm what a job needs, and we give you a clear price before any work begins.
Length, width and depth in feet.
Depth of bedding stone under and around the pipe.
Dug soil takes up more room than it did in the ground.
Cubic yards, truckloads and stone to plan for.
No. It is a planning guide. Soil type, trench shape and equipment change real quantities, and we confirm them on site.
Loose soil takes up more space than soil in the ground. The swell factor depends on the soil.
It depends on the pipe size and bedding depth. The tool estimates it from your inputs.
Pipe Slope and Fall CalculatorEnter run length and slope and see the total fall and the invert elevation at the far end.Try it
Underground Utility Cost EstimatorPick a project and a size and get a ballpark planning range.Try it
Trench or Bore Decision ToolAnswer a few questions about the surface, soil and length and see whether trenching or boring suits your line.Try it
Water Service Size PlannerCount your fixtures and see a planning size for the water service line.Try it
Utility TrenchingStraight, clean trenches for water, sewer, electric, gas and communication lines, cut to depth and width by machines…Explore
Excavation and BackfillDigging, bedding and backfilling done in layers with proper compaction, so the ground does not sink after the…Explore
Rock TrenchingCutting trenches through limestone and hard rock where a standard excavator bucket gives up, common across Middle Tennessee.Explore Quick scheduling, careful work and a clear price before we start.